Residential does not require any plans to be submitted at the current time. Fully engineered plans are required for
all commercial and industrial projects. These will include at a minimum:
Civil Sheets
- Site Plan to include grades, elevations, and all utilities both new and existing
Structural
- Foundations / reinforcement
- Building Structure
- Equipment Support
- Details as necessary
- Specifications
Architectural Sheets
- Code Review
- Basic Floor Plan/Elevations
- Details as necessary
- Specifications
Mechanical
- Duct work and Units
- Other Systems/Units
- Details as necessary
- Equipment Schedule(s)
- Specifications
Plumbing
- DWV Below and Above Grade
- Domestic Water Distribution
- Other Water Distribution
- Details as necessary
- Equipment Schedule(s)
- Specifications
Electrical
- Power Distribution
- Data
- Lighting
- Fire/Smoke Alarm (if required)
- Details as necessary
- Equipment Schedule(s)
- Panel Schedule(s)
- Specifications